Application for raking out and repointing external stonework and windows, renewing lead valley gutter and flat roof, applying Thermotek sealant to prevent damp, and installing Cavity Drain Membrane with new plasterboards.
Listed Building Consent
Steeple View Close, Hyde, SK14
SK14Full Proposal
Raking out and repointing of the external stonework and windows set in stone surrounds, renewal of lead valley gutter and lead flat roof, and application of colourless Thermotek liquid applied brick sealant to stone window surrounds to prevent penetrating damp and mould growth to internal face of the stone window surrounds. Installation of 4mm meshed Cavity Drain Membrane fixed to internal wall surfaces using standard fixings, which will be sealed. All joints where flanged sections are located will be sealed with tape. Where studded sections meet, sealing rope will be used. New plasterboards are to be 'dab fixed' to the meshed sysyem, dabs are to be placed over fixing centres a finishing plaster is then applied prior to decoration.
Application Timeline
- Application Registered
- 22/01/2025
- Application Validated
- 22/01/2025
- Target Decision Date
- 19/03/2025
- Committee Date
- N/A
- Decision Made
- N/A
- Decision Issued
- 15/05/2025
Case Officer
Applicant
Harinder Thind
Agent
Innovation Centre, Innovation Way, Heslington, York, YO10 5NY
Charles Garth Chartered Surveyors & Property Consultants